2.4.1 Laying out Installation Position
For details, see section 2.3.1 "Laying Out Installation Position".
2.4.2 Casting Cement Plinths
Determine the position of the wall or beam that bears the BTS3606A. Then cast two
cement plinths on the floor or platform right above the bearing wall or the beam.
The cement plinth must be 100 mm in height and the distance between two cement
plinths must be less than 6 m.
2.4.3 Preparing Channel Steel
Determine the length of channel steel according to the distance between cement
plinths, as shown in Figure 2-14
Figure 2-14
Preparing channel steel
2.4.4 Positioning Channel Steel
Drill twenty four
Φ
16 holes on the channel steel according to Figure 2-14.
2.4.5 Drilling Holes and Installing Expansion Bolts
For instructions on drilling holes and installing expansion bolts, see section 2.3.4
"Drilling Holes and Installing Expansion Bolts".
2.4.6 Fastening Channel Steel
Use one of the following methods to secure the channel steel on the cement plinths: