Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Table of Contents
Huawei Technologies Proprietary
ii
3.1.4 Installing Accessories.............................................................................................. 3-6
3.1.5 Removing Lugs (Optional) ...................................................................................... 3-8
3.2 Installation of Auxiliary Battery Cabinet ............................................................................. 3-8
3.2.1 Positioning Cabinet ................................................................................................. 3-8
3.2.2 Leveling Cabinet...................................................................................................... 3-9
3.2.3 Fastening Cabinet ................................................................................................... 3-9
3.2.4 Installing Accessories.............................................................................................. 3-9
3.2.5 Removing Lugs ..................................................................................................... 3-11
3.3 Installation and Removal of BTS3606A Cabinet Front Door ........................................... 3-11
3.3.1 Removing Front Door............................................................................................ 3-11
3.3.2 Removing Rear Door ............................................................................................ 3-11
3.4 Installation of Cabinet Equipment .................................................................................... 3-12
3.4.1 Installing Boards in Baseband Subrack ................................................................ 3-12
3.4.2 Installing Modules in RF Subrack.......................................................................... 3-14
3.4.3 Installing Power Module ........................................................................................ 3-15
3.4.4 Installing Built-in Batteries..................................................................................... 3-16
3.4.5 Installing Built-in Transmission Equipment ........................................................... 3-16
3.5 Installation or Removal of Auxiliary Battery Cabinet Doors ............................................. 3-16
3.5.1 Opening the Front Door ........................................................................................ 3-16
3.5.2 Removing the Rear Door ...................................................................................... 3-17
3.6 Installation of Batteries in Auxiliary Battery Cabinet ........................................................ 3-18
3.7 Illustration of Cabinets After Installed on Cement Plinth ................................................. 3-19
Chapter 4 Installing Outdoor Transmission and Power Interface Boxes ................................ 4-1
4.1 Introduction to Outdoor Transmission and Power Interface Boxes ................................... 4-1
4.1.1 Outdoor Transmission Interface Box....................................................................... 4-1
4.1.2 Outdoor Power Interface Box.................................................................................. 4-2
4.2 Installing Outdoor Transmission and Power Interface Box ............................................... 4-4
4.2.1 Mounting Transmission Interface Box on the Wall.................................................. 4-4
4.2.2 Mounting Transmission Interface Box on the Steel Pole ........................................ 4-6
4.3 Using Internal Components of Transmission Interface Box .............................................. 4-7
4.3.1 Using 120
Ω
DDF Unit.............................................................................................. 4-8
4.3.2 Using 75
Ω
DDF Unit................................................................................................ 4-9
4.3.3 Using Grounding Busbar......................................................................................... 4-9
4.3.4 Using 12-Core Fiber Fusing and Distributing Assemblies .................................... 4-10
4.4 Installing Outdoor Power Input Components................................................................... 4-12
4.4.1 Installing Diesel Air Breaker Assemblies .............................................................. 4-12
4.4.2 Installing Grounding Cable for Enclosure ............................................................. 4-13
4.4.3 Installing Input Components of Single-phase Mains and Diesel........................... 4-14
4.4.4 Installing Single-phase Mains Input Components................................................. 4-15
4.4.5 Installing Input Components of Three-phase Mains and Diesel ........................... 4-16
4.4.6 Installing Three-phase Mains Input Components ................................................. 4-17