Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 2 Installing Cabinet Base or Channel Steel
Huawei Technologies Proprietary
2-3
Start
Lay out the
installation position
Position the base
Drill holes
Install
expansion bolts
End
Does the cabinet
weight less than
800 kg?
Cast two cement
plinths
Prepare the
channel steel
Cast a cement plinth
Y
N
Fasten the
channel steel
Fasten the base
Position the
channel steel
Drill holes and install
expansion bolts
Figure 2-3
Installation flowchart
2.3 Installing Cabinet Base
This section introduces the procedure of installing a cabinet base, including:
z
Laying out installation position
z
Casting cement plinth
z
Positioning the base
z
Drilling holes and installing expansion bolts
z
Fastening the base
2.3.1 Laying Out Installation Position
The layout of the BTS3606A cabinet varies with the configuration. The following shows
the installation position of the BTS3606A cabinet in the following two cases:
z
When only one BTS3606A cabinet is installed.
z
When the BTS3606A cabinet is configured with a battery cabinet.