Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Index
Huawei Technologies Proprietary
i-1
Index
Numerics
12-core fiber fusing and distributing assembly,
4-10
A
air breaker
air breaker interlock device,
4-3
diesel air breaker,
4-3
mains air breaker,
4-3
antistatic wrist strap,
3-13
auxiliary battery cabinet,
3-9
B
baffle plate,
3-18
base
for battery cabinet,
2-1
for BTS3606A cabinet,
2-1
baseband
BCIM,
3-12
BCKM,
3-12
CCPM/CECM,
3-12
beam,
4-6
C
cabinet
auxiliary battery cabinet,
3-20
BTS3606A cabinet,
3-19
cable installation check,
6-2
cabling rack,
3-9
casting cement plinth,
2-5
cement plinth,
2-5
channel steel,
2-12
D
drilling hole,
2-8
,
2-12
dummy panel,
3-15
E
equipment installation check,
6-1
expansion bolt,
2-9
F
fastening cabinet,
3-4
fastening channel steel,
2-12
fastening the base,
2-10
flowchart of installing base or channel steel,
2-2
G
grounding busbar,
4-9
I
installation condition
load-bearing capacity requirement,
1-3
power supply and grounding requirement,
1-5
requirement for antenna system,
1-5
requirement for transmission system,
1-5
site requirement,
1-3
space requirement,
1-4
installation preparation,
1-1
installation procedure
checking cabinet installation,
6-1
installing cabinet and cabinet equipment,
3-1
installing cabinet base or channel steel,
2-1
installing outdoor transmission and power
interface boxes,
4-1
installing accessory,
3-6
installing baseband board,
3-12
installing battery,
3-18
installing built-in battery,
3-16
installing built-in transmission equipment,
3-16
installing cabinet base,
2-3
installing channel steel,
2-11
installing expansion bolt,
2-8