•
Info
•
Power
6.
IEC power receptacle.
3.2 Unpacking the ISR 9024 S/D Interconnect
The chassis is shipped in a double wall carton, surrounded by shock absorption material as
shown in
Figure 3-4
.
Figure 3-4 ISR 9024 S/D Packaging
5
1
2
3
4
6
7
Use the following procedure to unpack the ISR 9024 S/D (callout 3 in
Figure 3-4
):
1.
Place the carton on a secure work platform at a safe working height.
2.
Check the carton to ensure that it is factory sealed and undamaged. If the box shows sign
of damage or is unsealed, contact your HP sales or service representative.
3.
Use only short-bladed safety knife to slit the sealing tape, ensuring that you do not damage
the packaging or shock absorption material (callout 6 in
Figure 3-4
).
4.
Remove the top box (callout 4 in
Figure 3-4
), which contains small parts. Retain the packing
list for kit verification.
5.
Grasp the sides of the chassis and lift it out of the shock absorption material.
6.
Remove the anti-static plastic bag (callout 2 in
Figure 3-4
).
7.
Retain all the original packing materials for reuse or for return of a defective interconnect.
3.2 Unpacking the ISR 9024 S/D Interconnect
43
Summary of Contents for Cluster Platform Express v2010
Page 10: ...10 ...
Page 18: ...18 ...
Page 28: ...28 ...
Page 38: ...38 ...
Page 68: ...68 ...
Page 92: ...92 ...
Page 106: ...106 ...
Page 110: ...110 ...
Page 116: ...116 ...
Page 122: ...122 ...
Page 124: ...124 ...
Page 132: ...132 ...