Caution:
Due to the weight of the chassis, two people are required to remove it from the shipping container.
Before unpacking, ensure that the shipping containers are not damaged. Damage to shipping
containers (other than the normal wear-and-tear of shipping) indicates that the contents might
have been subjected to excessive shock.
4.2.1 Unpacking the ISR 9288
Use the following procedure to unpack the ISR 9288 container:
1.
Remove the top cover of the crate after releasing the four clamps.
2.
Verify that the top compartment of the crate (
Figure 4-1
) contains the following components:
1.
Rail kit.
2.
Cabling Guide brackets (these brackets are not used for HP Cluster platform
installations).
3.
Screw kit.
4.
Grounding kit.
5.
Console cable.
6.
Power cables (optional).
7.
Packing foam.
8.
Documentation.
Figure 4-1 Top Compartment in the ISR 9288 Crate
1
3
2
4
6
5
Description
Item
Screw kit
1
Console cable
2
Power cables (optional)
3
Rail kit
4
Grounding kit
5
Cabling guide bracket
6
4.2 Unpacking the Chassis
53
Summary of Contents for Cluster Platform Express v2010
Page 10: ...10 ...
Page 18: ...18 ...
Page 28: ...28 ...
Page 38: ...38 ...
Page 68: ...68 ...
Page 92: ...92 ...
Page 106: ...106 ...
Page 110: ...110 ...
Page 116: ...116 ...
Page 122: ...122 ...
Page 124: ...124 ...
Page 132: ...132 ...