32
Installation
Figure 7
Attaching port side of chassis to rack rails
Replacing the chassis door
To reinstall the chassis door:
NOTE:
The door is not hinged. It installs on the chassis by snapping the four ball studs located on the
chassis into the receiving hardware on the door.
1.
Align the eight ball studs on the chassis with mounting hardware locations on the chassis door while
pushing the door straight into the chassis.
2.
Snap the door into place over the ball studs (
Figure 8
and
Figure 9
).
26423a
Summary of Contents for A7990A - StorageWorks SAN Director 4/16 Blade Switch
Page 8: ...8 ...
Page 62: ...62 Monitor system components ...
Page 100: ...100 Installing Field replaceable units FRUs ...
Page 122: ...122 Intelligent blades ...
Page 132: ...132 Regulatory compliance and safety notices ...
Page 134: ...134 Port numbering templates 26390a ...
Page 135: ...DC SAN Backbone Director hardware reference guide 135 26389a ...
Page 136: ...136 Port numbering templates 26388a ...
Page 140: ...140 Port numbering templates ...