DC SAN Backbone Director hardware reference guide
25
7.
Remove the upper portion of the packing crate while the DC Director is still in the shipping area, to
reduce clutter at the installation site:
a.
Remove the straps securing the carton to the pallet.
b.
Lift the top of the crate off the pallet. Leave the foam on top of the chassis to hold the kits in place
during transportation to the installation area. Save the shipping crate and related items for any
future shipping requirements.
8.
Transport the chassis on the pallet to the installation area, using a pallet jack or other assisted lift. The
plastic pallet cannot fit through doorways that are less than 91 cm (36 in.) wide.
9.
Remove the 14U rack mount kit, accessory kit, packing foam, and anti-static plastic from the chassis
and set aside.
10.
Remove the chassis door from the DC Director. See ”
Removing the chassis door
” on page 30.
11.
Remove the cable management comb. See ”
Removing a cable management comb
” on page 65.
12.
Position the pallet so that the bottom of the chassis is level with the installation surface.
13.
If the chassis is on a pallet jack or lift, stabilize the pallet jack or lift to prevent it from moving during the
transfer.
14.
Unscrew the four bolts holding the DC Director to the pallet and remove the brackets.
15.
Gently slide the chassis onto the final installation surface, ensuring that it remains supported during the
transfer.
16.
Ensure that the chassis is oriented so that the non-port side has access to intake air (cool).
17.
Reinstall the cable management comb. See ”
Replacing a cable management comb
” on page 65.
18.
Reinstall the chassis door. See ”
Replacing the chassis door
” on page 64.
Items included with the DC Director
The following items are included with the standard shipment of the DC Director:
•
DC Director chassis, populated with:
• Two CP blades (CP8)
• Two Core switch blades (CR8)
• Blade slot filler panels (for slots not filled by a port, control processor, or core switch blade)
• Two power supplies and power supply filler panels
• Three Blower assemblies
• One WWN card and bezel
• One cable management comb
• Chassis door
•
Accessory kit containing the following items:
•
HP StorageWorks DC SAN Backbone Director quick start instruction
s
• ESD grounding straps
• Two AC power cords, 3 meters (one for each power supply)
• Two PDU power cords (one for each power supply)
• Two Power cord retainers
• RS-232 serial cable
•
14U rack mount kit (includes rear brackets and bottom support rails)
IMPORTANT:
Order SFP transceivers separately. The DC Director 8Gb port blades support HP
transceivers labeled “B-Series FC SFP” only. Check
http://www.hp.com
for more information on supported
transceivers.
Summary of Contents for A7990A - StorageWorks SAN Director 4/16 Blade Switch
Page 8: ...8 ...
Page 62: ...62 Monitor system components ...
Page 100: ...100 Installing Field replaceable units FRUs ...
Page 122: ...122 Intelligent blades ...
Page 132: ...132 Regulatory compliance and safety notices ...
Page 134: ...134 Port numbering templates 26390a ...
Page 135: ...DC SAN Backbone Director hardware reference guide 135 26389a ...
Page 136: ...136 Port numbering templates 26388a ...
Page 140: ...140 Port numbering templates ...