26
Installation
Installing the DC Director in the 14U Rack Mount Kit
Allow approximately one hour to unpack and install your DC Director using the 14U Rack Mount Kit
supplied with your unit. Obtain the following tools:
•
Torque wrench with #2 Phillips screwdriver tip
•
Flathead screwdriver
•
Hydraulic or assisted lift with a minimum raise of 55 in. (140 cm) and a minimum capacity of 250 lbs
(113 kg).
CAUTION:
A fully populated DC Director (eight FC8-48 port cards, 384 ports) weighs approximately
104 kg (228 lbs)
and requires a hydraulic or assisted lift to install it.
14U Rack Mount Kit
parts list
Table 7
and
Figure 3
identify the hardware provided in the 4U rack mount kit that ships with your DC
Director.
Table 7
Items supplied with the 14U rack mount kit (DC Director)
Item
Description
Quantity
For all types of installations
A
Left rack mount shelf bracket (rail brackets may differ from the illustration)
1
B
Right rack mount shelf bracket (rail brackets may differ from the illustration)
1
C
10-32 x 5/8 inch (1.58 cm) panhead Phillips screw, washer (torque to 32 in.-lbs, 37
cm-kgs)
6
For cabinets that have rails with round holes
D
10-32 clip nut
6
E
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw, with lock washer (torque to 80
in.-lbs, 92 cm-kgs)
16
For cabinets that have rails with square holes
F
10-32 retainer nut
6
G
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw, with glue (torque to 80 in.-lbs, 92
cm-kgs)
16
H
0.375 in. (0.953 cm) alignment washer
16
Summary of Contents for A7990A - StorageWorks SAN Director 4/16 Blade Switch
Page 8: ...8 ...
Page 62: ...62 Monitor system components ...
Page 100: ...100 Installing Field replaceable units FRUs ...
Page 122: ...122 Intelligent blades ...
Page 132: ...132 Regulatory compliance and safety notices ...
Page 134: ...134 Port numbering templates 26390a ...
Page 135: ...DC SAN Backbone Director hardware reference guide 135 26389a ...
Page 136: ...136 Port numbering templates 26388a ...
Page 140: ...140 Port numbering templates ...