![horiba OPSA-150 Instruction Manual Download Page 18](http://html1.mh-extra.com/html/horiba/opsa-150/opsa-150_instruction-manual_2162276018.webp)
2 Installation
6
2
Installation
2.1
Contact for Installation
2.2
Conditions for Installation
The unit is weather-proofed for outdoor installation; however, do not install the unit in
places subject to direct sunlight.
Install the unit near the water sampling point.
Install the unit where a water-supply system, drainage facilities and a power supply are
provided.
Install the unit in a place that is well ventilated, free from dirt or dust, and where no
corrosive gases will be generated.
Install the unit in a place that is free from strong vibration or ferromagnetic fields.
Install the unit where enough space is provided for conducting routine inspections and
maintenance.
Secure the unit using anchor bolts.
Install the unit where enough space is provided for conducting services.
Manufacturer:
HORIBA Advanced Techno Co., Ltd.
31, Miyanonishi-cho, Kisshoin Minami-ku, Kyoto 601-8306, Japan