
56
FSC Safety Manager Installation Guide
10/01
4.3
Configuration at TPS Universal Station,
Continued
Process Point
Building display
You must once again return to the NIM Build Type Select Menu to access
the FSC-SMM data point building displays. To do this, press the [F1 PED]
key.
Select the PROCESS POINT BUILDING target, once you have returned
to the NIM Build Type Select Menu. Figure 4-6 shows the display which
will be brought up.
Figure 4-6 – US Process Point Building display
11 Jun 97 14:05:00 3
ANALOG
INPUT
MENU
PAGE 01 OF 01
NIM BUILD TYPE SELECT MENU
DIGITAL
INPUT
REGULATORY
PV
F1=PED
F2=RECALL DISP
F3=
F4=
F5=OVERWRITE
F6=
F7=RECON
F8=PED STATUS
F9 =WLK BACK
F10=WRITE
F11=
F12=LOAD
NIM PROCESS POINT BUILD TYPE
LOGIC
FLAG
ARRAY
PROCESS
MODULE
ANALOG
OUTPUT
DIGITAL
OUTPUT
REGULATORY
CONTROL
TIMER
DEVICE
CONTROL
DIGITAL
COMPOSITE
NUMERIC
Continued on next page
Summary of Contents for FSC-SM
Page 2: ... ...
Page 6: ...iv FSC Safety Manager Installation Guide 10 01 ...
Page 12: ...x FSC Safety Manager Installation Guide 10 01 ...
Page 32: ...20 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 54: ...42 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 70: ...58 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 74: ... ...
Page 75: ... ...