4
FSC Safety Manager Installation Guide
10/01
1.3
Move Preparation,
Continued
Checklist
Table 1-1 provides a checklist to be used when planning the movement of
FSC Safety Manager cabinets.
Table 1-1 – Move preparation checklist
Check
Action
Notes
1
Travel Route
Chart the equipment's route of travel regarding:
•
loading doors — height and location,
•
elevators — size, capacity, and availability,
•
aisles — number, size, and layout,
•
doorways — number and size,
•
hallways — size, restrictions, and bends,
•
stairs and ramps — may require some type of
lifting, and
•
rigging of equipment — if needed.
2
Space
Is there enough space to hold the equipment?
3
Floor Loading
Will the floor in all areas be strong enough?
4
Power Distribution
Check for proper transformer sizes, distribution
panels and sufficient outlets for support, test and
maintenance equipment.
5
Grounding
Be sure that proper grounds are available.
6
Conduits and
Cable Trays
Make sure that conduits and cable trays are
large enough and the proper type to
accommodate all of the required cables.
7
Environment
Are lighting and other environmental
requirements adequate?
8
Security
Provide security clearances for the installation
crew if it is not composed of regular employees.
9
Responsibilities
Are all responsibilities clearly defined and
understood?
10
Communications
At minimum, three conveniently located
telephones are needed for:
•
Honeywell Technical Assistance Center (TAC)
data terminal,
•
Honeywell TAC voice, and
•
Operator
Emergency.
For additional information regarding actions described in the
Move Preparation Checklist, refer to SM02-550 —
TPS System Site
Planning Manual
in the Binder TPS 3020-1
System Site Planning-1.
Summary of Contents for FSC-SM
Page 2: ... ...
Page 6: ...iv FSC Safety Manager Installation Guide 10 01 ...
Page 12: ...x FSC Safety Manager Installation Guide 10 01 ...
Page 32: ...20 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 54: ...42 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 70: ...58 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 74: ... ...
Page 75: ... ...