Unpacking and Placement,
Continued
Fork lift
The FSC-SM cabinet is moved by fork lift to the final location. Table 1-4
lists special considerations regarding the use of a fork lift to move the
equipment.
Table 1-4 – Fork lift considerations
Number
Consideration
1
Move the equipment to the electronics room by fork lift; remove the
fork lift by placing the equipment onto the lumber pieces by 10 cm
(4 inches) as illustrated in Figure 1-9.
2
Tip the cabinet off the lumber and onto the floor; remove the lumber.
3
Manually move the cabinet to the exact final position.
Figure 1-9 – Placement of equipment onto lumber
Solid piece or combination
of lumber pieces to match skid
or pallet height (nail together).
Move cabinet onto the lumber.
Continued on next page
Summary of Contents for FSC-SM
Page 2: ... ...
Page 6: ...iv FSC Safety Manager Installation Guide 10 01 ...
Page 12: ...x FSC Safety Manager Installation Guide 10 01 ...
Page 32: ...20 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 54: ...42 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 70: ...58 FSC Safety Manager Installation Guide 10 01 Left blank intentionally ...
Page 74: ... ...
Page 75: ... ...