
Setpoint Scheduler
Setpoint Scheduler Operate
136
900 Control Station User Guide
Revision 9
May 2014
Item
Description
Schedule load/view/edit/save
Load From Schedule List
Loads a schedule from memory into the Setpoint Scheduler. Schedule
must be in READY state.
You are presented with a list of schedules (recipes) in controller memory.
Scroll to the desired schedule and touch to highlight it. Touch Load
Schedule button to load the selected schedule into the scheduler. The
loaded schedule overwrites the current schedule in the programmer.
To erase the currently loaded schedule from the Setpoint Scheduler,
select <Clear Schedule> and load it. When the schedule is cleared, any
edits are lost unless you saved them first with Save To Schedule List.
See Figure 9 Recipe Load on page 128. All recipe types (profiles,
sequences, schedules) are saved the same way.
Start at segment
After loading, the schedule will start at this segment. Subsequent runs will
start at Segment #1. If the segment number is within a recycle loop, the
schedule cycles through the looped segment according to the recycle
count.
Save To Schedule List
Saves the currently running schedule (and any edits) to a selected slot in
controller memory. Scroll to the desired slot in the controller’s schedule
memory. Once saved, it can be loaded and run later.
See Figure 10 Recipe Save on page 128. All recipe types (profiles,
schedules, sequences) are saved the same way.
View/Edit Schedule
Press to view/edit the current schedule. Edits take effect immediately in
the current schedule but they are not saved to schedule memory. When
the schedule is RESET, any edits are lost. To save your edits, see Save
To Schedule List. See View/Edit schedule on page 137.