
Setpoint Scheduler
Setpoint Scheduler Operate
Revision 9
900 Control Station User Guide
135
May 2014
Item
Description
Elapsed Time
Time elapsed in the segment. Run time only.
Time Remaining
Time remaining in the segment.
Recycles Remaining
Number of recycles remaining, according to the highest numbered
segment so far encountered in the schedule.
Example:
Segment #30 has recycle count = 10 and recycle segment #5. Therefore,
the first time the schedule reaches Segment #30, the schedule will recycle
(repeat) Segments #5 through #30 ten times. During the first recycling, it
will display “10”, during the second recycling it will display “9”, etc.
Operation Buttons
Run
Start a schedule that is in HOLD or READY state.
Hold
Put schedule in HOLD.
Advance
Jump to the next segment.
When the schedule is already in the last segment, the advance request is
ignored.
Schedules cannot be advanced to the first segment. Current state must
either READY or HOLD.
Reset
Reset a HOLD or STOP schedule to the first segment. Any edits made to
the schedule are lost unless they were saved. See Save To Schedule List.
PVs and SPs
SP1 through SP8
Value of all setpoints
PV1 through PV8
Value of all PVs.