3.1 Connection Procedure
40
Connect the instrument as follows:
3.1 Connection Procedure
1
Wiring diagram screen
Set the measurement conditions.
(p. 41)
3
Attach the clamp sensors.(p. 47)
4
Make connections.
5
Make connections.
(p. 50)
2
Attach the voltage cords.(p. 45)
6
Wiring Check screen
Set the current range. (p. 52)
Check the wirings. (p. 54)
Summary of Contents for PW3360-20
Page 2: ......
Page 66: ...3 8 Verifying Correct Wiring Wiring Check 58 ...
Page 104: ...7 2 Settings That Can Be Added to Quick Set Settings 96 ...
Page 120: ...8 8 Formatting the SD Memory Card or Internal Memory 112 ...
Page 166: ...11 4 Outputting a Pulse Signal 158 ...
Page 210: ...13 4 Disposing of the Instrument 202 ...
Page 218: ...A8 ...
Page 222: ...Index Index 4 ...
Page 223: ......
Page 224: ......