![Heyer iTernIS ADV Operator'S Manual Download Page 58](http://html1.mh-extra.com/html/heyer/iternis-adv/iternis-adv_operators-manual_2128282058.webp)
Start-up and initial calibration |
iTernIS ADV
5.
10
PEEP is produced from an air flow generated by a proportional valve. The calibra
-
tion of this valve is the first calibration carried out during this procedure.
In each initial calibration, the expiratory flow measurement element is calibrated.
The known flows are sent through the expiratory pneumotachograph, and the res
-
ponse of the related differential pressure transducers is monitored to characterize
their response and to develop an accurate calibration table.
During the final stage of the calibration process, a calibration of the O
2
cell shall be
performed.
The oxygen sensor calibration may fail in the following cases:
• The gas entering the OXYGEN inlet is not oxygen, or its concentration is not ade
-
quate.
• The sensor is exhausted.
Fig. 5-9
On-screen message showing an O
2
sensor calibration
failure.
NOTE
• Recalibration of the patient circuit during ope
-
ration of the ventilator must be carried out by
disconnecting the patient circuit and occluding
the opening of the Y-shaped connector. Take
precautions to provide an alternative ventilation
method during recalibration, if this were neces-
sary.
WARNING
• It is possible to recalibrate the patient circuit,
and the O
2
cell at any time during operation
of the ventilator. Accessing from [Menu] >>
Tools >> Calibrations both calibrations can
be run individually (see Menu chapter).
5.7.2
| PEEP valve calibration
5.7.3 |
Calibration of expiratory
pneumotachograph
5.7.4 |
Calibration of the O
2
cell
5.7.4.1 | Oxygen sensor failed
calibration
Summary of Contents for iTernIS ADV
Page 1: ...Operator s Manual Rev 1 0 07 2011 INNOVATIONS AS A SERVICE TO THE PATIENT ...
Page 2: ......
Page 3: ...User s Instruction Manual Rev 1 0 07 2011 ...
Page 10: ...User Instruction Manual iTernIS ADV vi This Page Left Intentionally Blank ...
Page 12: ...Introduction iTernIS ADV 1 2 This Page Left Intentionally Blank ...
Page 20: ...Warnings Precautions Notes iTernIS ADV 2 2 This Page Left Intentionally Blank ...
Page 24: ...Warnings Precautions Notes iTernIS ADV 2 6 This Page Left Intentionally Blank ...
Page 26: ...Assembly and installation iTernIS ADV 3 2 This Page Left Intentionally Blank ...
Page 50: ...Start up and initial calibration iTernIS ADV 5 2 This Page Left Intentionally Blank ...
Page 60: ...Start up and initial calibration iTernIS ADV 5 12 This Page Left Intentionally Blank ...
Page 62: ...Basic operations iTernIS ADV 6 2 This Page Left Intentionally Blank ...
Page 74: ...Basic operations iTernIS ADV 6 14 This Page Left Intentionally Blank ...
Page 76: ...Menu iTernIS ADV 7 2 This Page Left Intentionally Blank ...
Page 92: ...Menu iTernIS ADV 7 18 This Page Left Intentionally Blank ...
Page 94: ...Graphics management iTernIS ADV 8 2 This Page Left Intentionally Blank ...
Page 100: ...Graphics management iTernIS ADV 8 8 This Page Left Intentionally Blank ...
Page 102: ...ADL PED Operative modes iTernIS ADV 9 2 This Page Left Intentionally Blank ...
Page 120: ...ADL PED Operative modes iTernIS ADV 9 20 This Page Left Intentionally Blank ...
Page 122: ...NEO INF Operative modes iTernIS ADV 10 2 This Page Left Intentionally Blank ...
Page 136: ...NEO INF Operative modes iTernIS ADV 10 16 This Page Left Intentionally Blank ...
Page 138: ...Alarms iTernIS ADV 11 2 This Page Left Intentionally Blank ...
Page 148: ...Alarms iTernIS ADV 11 12 This Page Left Intentionally Blank ...
Page 150: ...Respiratory mechanics iTernIS ADV 12 2 This Page Left Intentionally Blank ...
Page 162: ...Respiratory mechanics iTernIS ADV 12 14 Fig 12 8 VD VT physiologic test screen ...
Page 164: ...Trends iTernIS ADV 13 2 This Page Left Intentionally Blank ...
Page 168: ...Trends iTernIS ADV 13 6 This Page Left Intentionally Blank ...
Page 170: ...Capnography iTernIS ADV 14 2 This Page Left Intentionally Blank ...
Page 176: ...Capnography iTernIS ADV 14 8 This Page Left Intentionally Blank ...
Page 178: ...Operational verification iTernIS ADV 15 2 This Page Left Intentionally Blank ...
Page 182: ...Operational verification iTernIS ADV 15 6 This Page Left Intentionally Blank ...
Page 184: ...Cleaning and maintenance iTernIS ADV 16 2 This Page Left Intentionally Blank ...
Page 192: ...Technical specifications iTernIS ADV 17 2 This Page Left Intentionally Blank ...
Page 205: ...Appendices iTernIS ADV A i Appendices Chapter Contents A I Troubleshootings ...
Page 206: ...Appendices iTernIS ADV A ii This Page Left Intentionally Blank ...
Page 212: ...Warranty iTernIS ADV G ii This Page Left Intentionally Blank ...
Page 215: ...Alphabetical index iTernIS ADV I iii W Watchdog 17 9 WOBi 7 3 Y Y connector or part 3 8 ...
Page 216: ...Alphabetical index iTernIS ADV I iv This Page Left Intentionally Blank ...
Page 217: ......
Page 218: ......