11
Maintenance schedule
80
11.4
Annually inspection (service, notification)
Annually inspection, at least every 3000 operating hours.
Maintenance by manufacturers or certified sales partners
Item
Procedure
Maintenance
Conduct system maintenance by authorised
personnel
Burn back
protection device
(symbolic
representation)
Unscrew revision cover (depending on the
boiler type)
Check BFP flap visually for damages, wear
and tightness
Open BFP flap by using the aggregate test
Position paper strip between hopper flange
and BFP flap and close BFP flap afterwards.
Try to pull out paper strip. If possible, adjust
BFP flap.
Conduct paper strip test at different positions
ID-fan
Unscrew 4x wing nut
Remove and clean ID-fan witch a brush
Summary of Contents for pelletstar CONDENSATION 10
Page 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Page 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Page 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Page 88: ...15 Annex 88 Program 2 ...
Page 89: ...Annex 15 89 Program 3 ...
Page 90: ...15 Annex 90 Program 4 ...
Page 91: ...Annex 15 91 Program 5 ...
Page 92: ...15 Annex 92 Program 6 ...
Page 93: ...Notes 16 93 16 NOTES ...