Maintenance schedule
11
77
Item
Procedure
Pivoting grate
Burning chamber
Check pivoting grate (4) visually for
damages and wear.
Conduct function test of pivoting grate
using the aggregate test
Check ignition pipe, if necessary cleaning
Ash ark
Open the ash tray door by pressing the
cover on the right side. Demount ash
container cover and check ash level and
empty ash container if necessary.
Control -
functioning
Check display, operation and faults list
(see chapter fault reports)
Restart T-Control
Control - faults
Opening the front door or ash door of the
boiler
4
Summary of Contents for pelletstar CONDENSATION 10
Page 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Page 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Page 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Page 88: ...15 Annex 88 Program 2 ...
Page 89: ...Annex 15 89 Program 3 ...
Page 90: ...15 Annex 90 Program 4 ...
Page 91: ...Annex 15 91 Program 5 ...
Page 92: ...15 Annex 92 Program 6 ...
Page 93: ...Notes 16 93 16 NOTES ...