T-CONTROL
9
41
Term
Description
Unit
Settings
1
Must temperature
Setting the must temperature (47-85) of the boiler
°C
Min. Temperature
Activate/setting the min. temperature (20-58) (ON/OFF)
▪
With activated min. Outside of the hot water tank loading time, the hot
water tank temperature is set to the set min. temperature loaded.
If the hot water tank temperature is below the value of the set min.
temperature, the hot water tank loading starts.
°C
Min. loading
Indicates/activates the min. loading (20-58) (ON/OFF)
▪
With activated min. Outside of the hot water tank loading time, the hot
water tank temperature is set to the set min.
If hot water tank temperature is lower than the min. loading / temperature
value, the hot water tank loading will start.
°C
Circulation
temperature*
Setting the circulation temperature of hot water tank
°C
Menu "Aggregate-Test"
Agg-Test
1
Hot water tank pump*
If the indicator light lights, the output for controlling of the hot water tank
pump is switched.
Loading valve
If the indicator light lights, the output for controlling of the loading valve is
switched.
Circulation pump
Indicates the state of the hot water tank pump:
If the indicator lamp lights up, the hot water tank pump is activated and
the hot water tank gets charged.
Menu "time program / barrier times / circulation times“
Time program
1 2 3
Time 1
1 - 3 times can be set. The second and third time can be added by the
+. Example:
▪
time 1:
08:00
– 10:00
▪
time 2:
15:00
– 21:00
▪
time 3:
00:00
– 00:00
-
08:00
– 11:00
Setting up individual hot water tank loading times of every weekday
-
By pressing the symbol Monday preset gets assigned to remaining
weekdays
-
Barrier times
4 5
Time 1
1 - 2 times can be set. The second time can be added by the +.
Example: see time program
-
08:00
– 11:00
Setting up individual hot water tank loading times of every weekday,
when it will be not heated
-
By pressing the symbol Monday preset gets assigned to remaining
weekdays.
-
Circulation time
6 7 8
Time 1
1 - 3 times can be set. The second time can be added by the +.
Example: see time program
-
08:00
– 11:00
Setting up individual hot water tank loading times of every weekday,
when the hot water tank circulates.
-
By pressing the symbol Monday preset gets assigned to remaining
weekdays.
-
Summary of Contents for pelletstar CONDENSATION 10
Page 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Page 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Page 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Page 88: ...15 Annex 88 Program 2 ...
Page 89: ...Annex 15 89 Program 3 ...
Page 90: ...15 Annex 90 Program 4 ...
Page 91: ...Annex 15 91 Program 5 ...
Page 92: ...15 Annex 92 Program 6 ...
Page 93: ...Notes 16 93 16 NOTES ...