The handling and menu navigation are described in this chapter. Every single T-CONTROL parameter is
explained in chapter 9.2.
9.1
Starting the system
To switch on the display, two conditions must be fulfilled:
◼
The boiler must be connected to the power supply (see figure below)
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
Plug for preparation of the power supply of a split boiler on the back of the boiler.