Maintenance schedule
11
79
11.3
Biannual inspection
Item
Procedure
ID-fan
Function test of ID-fan using the aggregate
test
Check ID-Fan for abnormal or conspicuous
running noises
Sensor barrier
(intermediate
hopper -BFP)
Unscrew revision cover (depending on the
boiler type).
Check BFP flap visually for damages, wear
and tightness.
Clean
sensors
on
the
inside
of
the
intermediate hopper (at BFP) with soft tissue
on the left and right.
Heat exchanger
Demount top boiler cover (1)
Unscrew
and
remove
heat
exchanger
insulation cover (2)
Remove deposit and check heat exchanger
visually for damages and wear
Conduct function test of heat exchanger using
the aggregate test
Check rinsing function with unit test and clean
if necessary
Siphon
Clean or flush siphon
1
2
Summary of Contents for pelletstar CONDENSATION 10
Page 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Page 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Page 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Page 88: ...15 Annex 88 Program 2 ...
Page 89: ...Annex 15 89 Program 3 ...
Page 90: ...15 Annex 90 Program 4 ...
Page 91: ...Annex 15 91 Program 5 ...
Page 92: ...15 Annex 92 Program 6 ...
Page 93: ...Notes 16 93 16 NOTES ...