9
T-CONTROL
28
Navigation 3:
Load scheme
Navigation 4:
Show value BOILER 000
Screen:
Screen:
Note:
By pressing the button:
The values of the default scheme can also be
adapted individually. There by press 3-5 seconds on
the value and follow the procedure described in
figure "boiler display value select".
Boiler-must,
Power, Back
flow-must, etc.
the value will be confirmed and
displayed at the main menu.
the page previous page of the
individual
modules
will
be
displayed
you get to the second page of the
display values of the boiler or the
selected module
Note:
The same procedure can be applied to all other
modules.
9.8.2
Delete values
Delete all display values
Delete optional display value
Navigation:
Code
– entry
→
Symbol
→
press on an empty field
→
Clear
all
Navigation:
Code
– entry
→
press 3-5
seconds on the to deleted value
→
Act. clear
Screen:
Screen:
Summary of Contents for pelletstar CONDENSATION 10
Page 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar CONDENSATION 10 60 ...
Page 86: ...15 Annex 86 Hydraulic recommendation 2 ...
Page 87: ...Annex 15 87 15 2 Solar module schematic representation Program 1 ...
Page 88: ...15 Annex 88 Program 2 ...
Page 89: ...Annex 15 89 Program 3 ...
Page 90: ...15 Annex 90 Program 4 ...
Page 91: ...Annex 15 91 Program 5 ...
Page 92: ...15 Annex 92 Program 6 ...
Page 93: ...Notes 16 93 16 NOTES ...