Assembly
59
Location of the heating bath
➜
The base unit is located on a suitable surface. Verify that suffi cient
space (approx. 20 cm around the evaporator) and a solid seating
are available in the shifting area.
➜
Verify a solid seating of the heating bath base and the bath.
Heating bath set-up when using Chiller
1
2
1
Chiller
2
Chiller extension plate
Location of the heating bath when using Chiller
➜
The base unit is located on a suitable surface. Verify that suffi -
cient space (approx. 20 cm around the evaporator) and a solid
seating are available in the shifting area and the Chiller.
➜
Verify a solid seating of the heating bath base and the bath as
well as the Chiller extension.
1.
Place the two screws on the right side of the extension plate of the Chiller. (Contact a
local Heidolph Distributor if using a previously purchased Chiller before July, 2009 for
proper attachments of the extension plate.
2.
Check the extension plate (2) for proper seating.
Glassware sets
Assemble glassware sets
Assembling the glassware sets will be described in the following. The rotary evaporators
can be equipped with various glassware sets.
✓
The base unit is set up and installed.
✓
A water or coolant connection is available (does not apply for glassware set G5).
✓
Lift is in the top position (see chapter 4.4.6).
Summary of Contents for Hei-VAP