Sub-Assembly 2: Left Handle Structure
ts N
1 – Left Main Handle
¾
or bolts, put them on threads first, nylon last.
Hold the head of the bolt stationary with the Alan Wrench while turning the nylock with the Socket
Wre
Par
eeded: 1 – Top Plate
1 – Lower Rear Handle
2 – ¼” x 50mm Connector Bolt
2 – ¼” Flat washers
2 – ¼” Nylock Nut
¾
Pair the Left Main Handle and L
on the outside, line up the holes at the bottom and pl
¾
Insert 50mm connector bolts in
¾
Place a ¼” flat washer and ¼” nylock nut on each bolt.
¾
Completely tighten the nylocks
ower Rear Handle together as pictured. With the Left Main Handle
ace them inside the walls of the Top Plate.
to the inside wall, through the handles and out the other wall.
on both bolts.
NOTE:
When tightening nylocks onto these connect
nch.
Left Handle Structure
Left Main
Handle
Handle
1/4 nylock
50mm connector
Lower Rear
1/4 fl
wash
at
er
bolt
nut
19