Options
5.6.5 Fill the floor ring space with screed.
X
Take the screed height in the floor ring into account.
The dimension of 22 mm in the drawing below refers to the standard floor entrance mats of GEZE.
à
GEZE recommends sealing the surface of the screed in indoor areas.
X
Pour screed into the drive box and floor ring (1).
* Refers to the standard GEZE entrance mats
5.6.6 Installing the drive
X
Open the stainless steel panel of the drive.
X
Install and connect the motor and drive.
X
Realize the cabling to the sensors.
X
Use the valid wiring diagram for the wiring and future commissioning.
5.6.7 Inserting side elements
X
Insert the 4 mm high glazing packers (3).
X
Place the side elements (1) on the floor ring (4).
X
Secure the inserted side elements against falling
over by using a strap in the upper third.
X
Align the side elements exactly.
X
After mounting has been completed, seal the
open gaps (2).