4 - 8
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
Part No. 139378
June 2011
Section 4 • Repair Procedures
REV A
PLATFORM COMPONENTS
7 Move the platform up and down by hand, so it
bounces approximately 2.5 to 5 cm / 1 to 2
inches. Allow the platform to settle.
Result: The overload indicator lights are off and
the alarm does not sound. Proceed to step 8.
Result: The overload indicator lights are
flashing at the platform and ground controls,
and the alarm is sounding. Repeat this
procedure beginning with step 5.
Note: There may be a 2 second delay before the
platform overload indicator light and alarm
responds.
8 Add an additional 10 lb / 4.5 kg test weight to
the platform.
Result: The overload indicator light is flashing at
both the ground and platform controls, and the
alarm is sounding. Proceed to step 9.
Result: The overload indicator light is off at both
the ground and platform controls, and the alarm
does not sound. Remove the additional 10 lb /
4.5 kg test weight. Repeat this procedure
beginning with step 6.
Note: There may be a 2 second delay before the
platform overload indicator light and alarm
responds.
9 Test all machine functions from the platform
controls.
Result: All platform control functions should not
operate.
10 Turn the key switch to ground control.
11 Test all machine functions from the ground
controls.
Result: All ground control functions should not
operate.
12 Using a suitable lifting device, lift the test weight
off the platform floor.
Result: The platform overload indicator light
should be off at both the ground and platform
controls and the alarm should not sound.
Note: There may be a 2 second delay before the
overload indicator lights and alarm turn off.
13 Test all machine functions from the ground
controls.
Result: All ground control functions should
operate normally.
14 Turn the key switch to platform control.
15 Test all machine functions from the platform
controls.
Result: All platform control functions should
operate normally.
Summary of Contents for Z-30/20N
Page 1: ......
Page 148: ...6 46 June2011 Section 6 Schematics 6 45 Power Cable Wiring Diagram...
Page 149: ...6 47 Section 6 Schematics June2011 6 48 Drive Contactor Panel Wiring Diagram...
Page 152: ...6 50 June2011 Section 6 Schematics Manifold and Limit Switch Wiring Diagram 6 49...
Page 153: ...6 51 Section 6 Schematics June2011 6 52 LVI BCI Option Wiring Diagram...
Page 156: ...6 54 June2011 Section 6 Schematics 6 53 Charger Interlock Option...
Page 157: ...6 55 Section 6 Schematics June2011 6 56 CTE Option CE Models...
Page 160: ...6 58 June2011 Section 6 Schematics Hydraulic Schematic 6 57...