Checklist D Procedures
D-1
Check the Primary Boom
Wear Pads
Note: Genie specifications require that this
procedure be performed every 1000 hours or
annually, whichever comes first.
Maintaining the primary boom wear pads in good
condition is essential to safe machine operation.
Wear pads are placed on boom tube surfaces to
provide a low friction, replaceable wear pad
between moving parts. Improperly shimmed wear
pads or continued use of worn out wear pads may
result in component damage and unsafe operating
conditions.
1 Measure each wear pad. Replace the wear pad
once it reaches the minimum allowable
thickness. If the wear pad is still within
specifications, shim as necessary to obtain
minimum clearance with zero binding.
2 Extend and retract the primary boom through
the entire range of motion to check for tight
spots that could cause binding or scraping.
Note: Always maintain squareness between the
primary boom outer and inner tubes.
Models without rotating jib boom:
Primary boom wear
pad specifications
Minimum
Top and side wear pads
5
/
8
inch
(extension end of boom)
15.9 mm
Bottom wear pads
5
/
8
inch
(extension end of boom)
15.9 mm
Bottom and side wear pads
5
/
8
inch
(pivot end of boom)
15.9 mm
Top wear pads
3
/
8
inch
(pivot end of boom)
9.5 mm
Models with rotating jib boom:
Primary boom wear
pad specifications
Minimum
All wear pads
3
/
8
inch
9.5 mm
Summary of Contents for Z-30/20N
Page 1: ......
Page 148: ...6 46 June2011 Section 6 Schematics 6 45 Power Cable Wiring Diagram...
Page 149: ...6 47 Section 6 Schematics June2011 6 48 Drive Contactor Panel Wiring Diagram...
Page 152: ...6 50 June2011 Section 6 Schematics Manifold and Limit Switch Wiring Diagram 6 49...
Page 153: ...6 51 Section 6 Schematics June2011 6 52 LVI BCI Option Wiring Diagram...
Page 156: ...6 54 June2011 Section 6 Schematics 6 53 Charger Interlock Option...
Page 157: ...6 55 Section 6 Schematics June2011 6 56 CTE Option CE Models...
Page 160: ...6 58 June2011 Section 6 Schematics Hydraulic Schematic 6 57...