Part No. 139378
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N
3 - 7
Section 3 • Scheduled Maintenance Procedures
June 2011
REV A
A-2
Perform Pre-operation
Inspection
Note: Genie specifications require that this
procedure be performed daily or every 8 hours,
whichever comes first.
Completing a pre-operation inspection is essential
to safe machine operation. The pre-operation
inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently
wrong with a machine before the operator performs
the function tests. The pre-operation inspection
also serves to determine if routine maintenance
procedures are required.
Complete information to perform this procedure is
available in the Operator's Manual located on your
machine.
CHECKLIST
A
PROCEDURES
A-3
Perform Function Tests
Note: Genie specifications require that this
procedure be performed daily or every 8 hours,
whichever comes first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the Operator's Manual located on your
machine.
Summary of Contents for Z-30/20N
Page 1: ......
Page 148: ...6 46 June2011 Section 6 Schematics 6 45 Power Cable Wiring Diagram...
Page 149: ...6 47 Section 6 Schematics June2011 6 48 Drive Contactor Panel Wiring Diagram...
Page 152: ...6 50 June2011 Section 6 Schematics Manifold and Limit Switch Wiring Diagram 6 49...
Page 153: ...6 51 Section 6 Schematics June2011 6 52 LVI BCI Option Wiring Diagram...
Page 156: ...6 54 June2011 Section 6 Schematics 6 53 Charger Interlock Option...
Page 157: ...6 55 Section 6 Schematics June2011 6 56 CTE Option CE Models...
Page 160: ...6 58 June2011 Section 6 Schematics Hydraulic Schematic 6 57...