Instructions for use and maintenance
This manual is owned by GEA Niro Soavi Any reproduction, even partial, is prohibited.
07C100-7C0
GEA Niro Soavi
147
SHEET A[f]
COMPRESSION HEAD -
Visually check for leakage from the packings and from the gaskets
of the head
CAUTION:
These activities should be carried out while the machine is in operation. Exercise extreme
caution
RESOURCES AND TOOLS
: OPERATOR
JOB FREQUENCY
: AT EACH START-UP
TIME REQUIRED
: 5 MINUTES
DESCRIPTION:
To visually check for leakage from the
gaskets
of the head, proceed as follows:
- Observe any product leakage from the mating surfaces between the flanges and the compression
head.
To visually check for leakage from the
packings
, proceed as follows:
- Check for any product leakage from the packing container flanges towards the sump area (the
area behind the compression head).
FIG. 7-22
Summary of Contents for Niro Soavi One7TS
Page 2: ......