![GEA Niro Soavi One7TS Instruction Manual Download Page 202](http://html1.mh-extra.com/html/gea/niro-soavi-one7ts/niro-soavi-one7ts_instruction-manual_572298202.webp)
Instructions for use and maintenance
This manual is owned by GEA Niro Soavi Any reproduction, even partial, is prohibited.
07C100-7C0
GEA Niro Soavi
200
SHEET L[d]
DRIVE -
Check pulley alignment
CAUTION:
Activities to be carried out after maintenance shutdown of the machine (see paragraph 7.3.3)
RESOURCES AND TOOLS
: MAINTENANCE ENGINEER
JOB FREQUENCY
: AFTER EACH MAINTENANCE JOB
TIME REQUIRED
: 5 MINUTES
DESCRIPTION:
Correct alignment is vital for the durability of the drive belts.
This operation is carried out during assembly by skilled personnel, however it is advisable to check
the alignment, placing a metal rule over the 2 pulleys as shown in figure 7-47.
FIG. 7-47
Summary of Contents for Niro Soavi One7TS
Page 2: ......