Section 14.0 - Installation Checklist
Section 14.0
Installation Checklist
Purpose:
Installation checklist to confirm that all critical installation steps have been completed..
Item #
Item
Sign Off
1.)
Power and ground cables connected and tightened:
Power cables (how many?, where?)
2.)
All signal cables connected and tightened.
3.)
Cable shield clamps installed and tightened (how many?, where? TBD).
4.)
All mounting bolts installed and tightened (floor, wall and ceiling).
5.)
Detector installed and connected.
6.)
Control room cables properly dressed.
7.)
Correct language decal applied.
8.)
Room cleaned.
9.)
Product locator cards collected.
10.)
Missing components and/or options:
11.)
List of any installation drawing deviations (all deviations should be signed by customer
and reviewed by the installation specialist).
12.)
Packing materials disposed of.
13.)
Have all calibrations been completed?
14.)
Have purchased options been installed/enabled/configured?
15.)
All appropriate regulatory labels installed:
Warning labels
Rating plates
16.)
InSite checkout completed?
17.)
Have functional checks been completed?
18.)
Have all protective tape/coverings been removed?
19.)
Are there any appearance issues?
20.)
Are there any system issues?
21.)
Are there any functional limitations?