Figure 252: Installing the LC kit (C)
▶
Install the air grid (see arrow).
▶
Fasten the two screws of the air grid (see circles).
▶
Install the OCP dummy cover or the OCP module, see
"Installing the OCP module" on page 251
.
▶
Install the cross bar, see
"Installing the cross bar" on page 81
Concluding steps
▶
If applicable, install the riser module, see
"Installing the riser module 2" on
▶
"Installing the air duct" on page 79
.
▶
▶
"Connecting the power cord" on page 65
▶
"Switching on the server" on page 69
Liquid cooling (LC)
RX2540 M6
Upgrade and Maintenance Manual
383
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...