Installing the new OCP module
▶
"Installing the OCP module" on page 251
.
Concluding steps
▶
"Connecting the power cord" on page 65
▶
"Switching on the server" on page 69
▶
"Installing the front cover with lock" on page 69
.
▶
Inform the customer about the changed MAC addresses, see
MAC/WWN/GUID and SAS addresses" on page 107
▶
"Updating the NIC configuration file in a Linux and VMware environment" on
.
▶
"Configuring LAN teaming" on page 113
9.6
Expansion cards in standard PCIe slots
9.6.1
Installing an expansion card
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Software: 5 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Preliminary steps
▶
"Suspending BitLocker functionality" on page 87
.
▶
"Removing the front cover with lock" on page 52
.
▶
"Shutting down the server" on page 52
.
▶
"Disconnecting the power cord" on page 53
.
▶
"Getting access to the component" on page 56
Expansion cards and backup units
RX2540 M6
Upgrade and Maintenance Manual
255
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...