▶
Wait until the firmware restore is completed.
BIOS or iRMC S5 firmware restore feature is executed at the same
time as the power cord is connected after the system board
replacement.
Depending on the configuration of your server the firmware restore
requires different time, see
"States of power-on indicator and time
duration during firmware restore" on page 552
9 - 23 minutes (systems without PFR feature),
18 - 38 minutes (systems with PFR feature).
Do not perform the following operations after connecting the power
cord. Please wait for the above time to elapse.
–
Remove and reinsert the power cord
–
Power button on/off
–
Connecting and disconnecting other cables, etc.
▶
Check the status of the power-on indicator to verify if the firmware restore
was successful, see
"States of power-on indicator and time duration during
.
If the firmware restore is successfully completed, the power-on indicator is lit
white.
If the power-on indicator is not lit white, an error has occured. Disconnect
and connect the power cord and try to boot up, or replace the system board
again.
▶
After completion of the firmware restore, connect to the iRMC and check the
"Messages of firmware restore in SEL log files" on
.
▶
Reboot the system by disconnecting and connecting the power cord. After
disconnecting the power cord, wait 60 seconds and connect it again.
▶
"Switching on the server" on page 69
▶
Check that the Customer Production firmware version is restored to the
current BIOS or iRMC S5 version in the new system board using the BIOS
Setup Utility.
▶
"Installing the front cover with lock" on page 69
.
System board and components
RX2540 M6
Upgrade and Maintenance Manual
531
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...