Additionally, a lifter is required in the following cases:
–
The server weighs more than 50 kg.
–
The server weighs more than 21 kg and is to be installed above the height of
25 U.
When using a lifter, this installation procedure needs to be carried out by
maintenance personnel.
Figure 13: Installing the server in the rack rails
▶
Fully extend the rack rails until they lock in place (1).
The rack rails must click into place so that they can no longer be
moved.
▶
At a slight angle, lower the server onto the rear mounting point on the rack
rails (2).
▶
Ensure that all four rack mounting bolts are properly seated in the mounting
points on the rack rails and that the locking bars engage.
Basic hardware procedures
RX2540 M6
Upgrade and Maintenance Manual
63
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...