Figure 16: Connecting the server to the DC voltage - example DC PSU -48 V
▶
Connect the power cord to the PSU (1).
▶
Fasten the two studs (2).
▶
Ensure that the status indicator on the PSU is lit green, see
.
▶
If necessary, make a permanent connection to the distribution board.
CAUTION
If the server/rack is intended for permanent connection to the mains only
an authorized specialist (electrician) is allowed to work.
▶
Please follow the regulation of each country.
It will take about 60 seconds until the server can be switched on.
Basic hardware procedures
RX2540 M6
Upgrade and Maintenance Manual
67
Summary of Contents for PRIMERGY RX2540 M6
Page 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Page 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Page 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Page 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Page 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Page 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Page 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Page 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Page 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Page 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...