Antaira Technologies, LLC
Industrial Wireless Device Server
STW-611C & STW-612C Series
Hardware Installation Guide
Version 1.1
Updated December 2014
URL:
www.antaira.com
Email:
Technical Support:
Package Check List
The package includes the following items
:
Industrial Wireless Serial Device Server (STW-61xC)* 1
3dBi Antenna * 1
3-Pin 5.08mm Power Terminal Block *1
5-Pin 5.08mm Serial Port Terminal Block (STW-611C)* 1
Mounted DIN-Rail Bracket * 1
Hardware Installation Guide * 1
Product CD Software * 1
Installation Overview
1. Wall Mounting
Place the wall mount kit and screws
on the back of the device as shown
in Fig.1.
2. Grounding
On the top of the device (as
shown in Fig.2)
–
Choose a terminal within the
power terminal block for frame
ground; or connect the wire to the
grounding screw next to the
power terminal block.
(Grounding is required to be connected all the times,
after installation)
3. Install Antenna
Install the antenna to the female
RP-SMA connector
– as shown in
Fig.3.
4. DIN-Rail Mounting
Follow Fig.4 to install the
device with DIN-Rail, and
follow Fig.5 to remove
device from DIN-Rail.
5. Ethernet Connection
Connect the device to a LAN
(Switch or PC) by using an
Ethernet cable to the
device’s
RJ45 port.
Notes
The opening holes on the sides of the device are for the
device’s heat dissipation; please do not block or cover
them with any objects.
Device Dimensions, Physical Appearance,
and Mounting
Environmental Limitations
Please make sure the STW-61xC unit is installed in a
dry location, free from dirt and corrosive vapors
– for
more details; please refer to the user manual.
Unit Dimensions and Layout (unit = mm)