-36-
(3)
Then the splicer beeps 3 times after
θ
axis
alignment is finished and displays a "SET
PM UNIT" message on the monitor.
(Display 6)
10. Adjustment of the analyzer
(1) In the case of " PMALIN MAX"
Adjustment of the analyzer is not needed.
Go to next step.
(2) In the case of " PMALIN MIX"
Rotate the analyzer about 90 degrees, so
that the valve of the power meter becomes
maximum.
11. Press the "SET" key
(1) Press the "SET" key. The splicer aligns the
core by RIDS.
(2) The splicer will be in a pause state after
alignment is done. (Display 7)
12. Press the "SET" key
(1) Press the "SET" key again. Both fibers
move toward each other again. The splicer
sets a narrow gap between the fiber ends.
(2) The splicer begins high voltage ARC
fusion, and stuffs the left fiber forward
the right fiber. (Display 8)
(3) "FINISHED" message is displayed on the
monitor after ARC fusion splicing.
(Display 9)
13. Observe the splice point visually
Observe the splice point visually. Refer to
section 4.2.6.
14. Remove the spliced fiber
Remove the spliced fiber carefully. Refer to
section 4.2.8.
P3
## ARC ## 15 (Y )
Display 8
P3
SET PM UNIT ( X)
Display 6
P3
PAUSE (X)
Display 7
P3
FINI SHED ( X)
Display 9
Summary of Contents for FSM-20PMII
Page 1: ...II ...
Page 2: ... 1 1 GENERAL 1 GENERAL 1 GENERAL 1 GENERAL ...
Page 4: ... 3 2 CONSTRUCTION 2 CONSTRUCTION 2 CONSTRUCTION 2 CONSTRUCTION ...
Page 15: ... 14 4 OPERATION 4 OPERATION 4 OPERATION 4 OPERATION ...
Page 18: ... 17 Hear is Flowchart page 1 ...
Page 19: ... 18 Hear is Flowchart page 2 ...
Page 42: ... 41 5 MENU COMMANDS 5 MENU COMMANDS 5 MENU COMMANDS 5 MENU COMMANDS ...
Page 58: ... 57 7 OHTERS 7 OHTERS 7 OHTERS 7 OHTERS ...
Page 66: ... 65 8 MAINTENANCE 8 MAINTENANCE 8 MAINTENANCE 8 MAINTENANCE ...
Page 80: ... 79 9 TROUBLE SHOOTING 9 TROUBLE SHOOTING 9 TROUBLE SHOOTING 9 TROUBLE SHOOTING ...
Page 88: ... 5 6 2 0 0 0 2 0 0 0 5 5 3 1 2 1 26 6 20 5 2 0 0 2 0 0 9 A 2 6 3 0 0 0 0 2 3 A 2 6 8 0 0 1 ...