3
EtherCAT with FHPP
78
Festo – EMCA-EC-C-HP-EN – 2017-11e – English
3.11
Configuration of EtherCAT participants
Several steps are required in order to produce an operational EtherCAT interface.
We recommend the following procedure:
1. Parameterisation and commissioning with the Festo Configuration Tool (FCT).
2. In addition, the following settings on the fieldbus page:
–
Device profile FHPP (register of operating parameters)
–
Optional use of FPC and FHPP+ (FHPP+ Editor tab)
3. Incorporate the XML file in the project planning software.
3.12
Parameterisation with the Festo Configuration Tool (FCT)
Notes on parameterisation with the Festo Configuration Tool (FCT)
è
FCT help for the
PlugIn EMCA.
3.12.1
Parameterisation of the EtherCAT interface
With the help of the Festo Configuration Tool (FCT), settings at the EtherCAT interface can be read out
and configured. The aim is to configure the EtherCAT interface via the Festo Configuration Tool (FCT) in
such a way that the EMCA can establish EtherCAT communication with an EtherCAT controller.
Note
The FCT settings are taken over into the permanent memory of the EMCA only after
“Download”, “Save” and “Restart controller”.
3.12.2
Setting the optional use of FPC and FHPP+
In addition to the controller and status data, the following data can also be transmitted:
–
Festo Parameter Channel (FPC)
è
–
Expansion of the FHPP standard data (FHPP+)
è
Configuration and parameterisation are performed using the Festo Configuration Tool (FCT), page “Field
bus”, register “FHPP+ Editor”.
Summary of Contents for EMCA-EC-67 CO Series
Page 33: ...2 CANopen Festo EMCA EC C HP EN 2017 11e English 33 ...
Page 73: ...3 EtherCAT with FHPP Festo EMCA EC C HP EN 2017 11e English 73 ...
Page 87: ...4 EtherNet IP with FHPP Festo EMCA EC C HP EN 2017 11e English 87 ...
Page 113: ...6 PROFINET IO with FHPP Festo EMCA EC C HP EN 2017 11e English 113 ...
Page 116: ...7 FHPP 116 Festo EMCA EC C HP EN 2017 11e English ...
Page 140: ...8 FHPP standard data I O data 140 Festo EMCA EC C HP EN 2017 11e English ...
Page 148: ...9 Measuring reference system 148 Festo EMCA EC C HP EN 2017 11e English ...
Page 210: ...10 Control via FHPP 210 Festo EMCA EC C HP EN 2017 11e English ...
Page 223: ...11 Monitoring of the drive behaviour Festo EMCA EC C HP EN 2017 11e English 223 ...
Page 367: ...D CANopen communication Festo EMCA EC C HP EN 2017 11e English 367 ...
Page 402: ...F Diagnostics and fault clearance 402 Festo EMCA EC C HP EN 2017 11e English ...
Page 413: ...EMCA EC 67 CO DIO EC EP PN Festo EMCA EC C HP EN 2017 11e English 413 ...
Page 414: ...EMCA EC 67 CO DIO EC EP PN 414 Festo EMCA EC C HP EN 2017 11e English ...
Page 415: ......