![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517075.webp)
SECTION 7
7-9
CHECK-OUT
CHECK PUSH OUT PANEL SHOES
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Visually inspect all pushout shoes for excessive
wear. These items must be replaced before there
is metal to metal contact.
Shim or replace worn parts as described in Sec. 9,
SERVICE AND REPAIR under PUSHOUT PANEL.
1.
2.
WEAR
SHOES
POWER TAKE OFF (P.T.O.)
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Periodically re-torque the mounting bolts or studs
as outlined in the P.T.O. manufacturers service
manual.
1.
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...