![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517132.webp)
SECTION 9
9-37
SERVICE AND REPAIR
INSPECTION AND REPLACEMENT
OF CARRIER PANEL
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Carefully inspect all pivot, bearing and roller sur-
faces for excessive or uneven wear, scoring or dam-
age.
Check the panel for broken welds, bent edges or
warpage.
Inspect the track bar for excessive wear or dam-
age.
Replace parts as necessary.
1.
2.
3.
4.
INSTALLATION OF CARRIER PANEL
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Install the carrier panel in the approximate reverse or-
der of disassembly. Pay particular attention to the in-
stallation of roller and bearing assemblies as described
earlier in this section.
TRACK BAR REPLACEMENT
OPERATIONAL STATUS
Truck Off
PTO Disengaged
NOTE:
Refer to Sec. 4, GENERAL REPAIR PRACTICES for
welding instructions.
Remove the old track bar and make sure the track
channel is smooth and clean.
Weld a new track bar in place. The surface of the
track bar must be at 90 degrees from the side of
the tailgate so the roller will run true.
1.
2.
CAUTION
The Leach track bar is made out of special alloy bar
steel. Do not substitute a different steel. It may
cause damage to the tailgate.
PACKER
PANEL
CARRIER
PANEL
WRONG
RIGHT
GAP
NO GAP
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...