![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517127.webp)
SECTION 1
9-32
SERVICE AND REPAIR
DESCRIPTION OF CARRIER AND
PACKER PANELS
The carrier and packer panels operate as a single unit
to sweep the refuse from the hopper and to pack it
against the pushout panel. Their movement through the
different cycles is controlled by the operating cylinders.
The two panels are connected together and pivot on
the inside and outside bearing assemblies. Movement
of the panels within the body is kept in alignment by the
roller assemblies, located at the upper corners of each
panel. The rollers ride inside a roller track on each side
of the hopper.
This section focuses on some factors that need to be
taken into consideration when performing packer/car-
rier repairs. The packer/carrier assemblies and interre-
lated components are designed for relatively trouble free
use, however they are subject to reduced service life
due to the lack of, or ineffective maintenance. Methods
of operation other than for which the unit was designed
can also affect the longevity of these components.
CARRIER PANEL
CYLINDERS
PACKER PANEL
CYLINDERS
PACKER PANEL
CARRIER PANEL
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...