![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517032.webp)
OPERATION
OPERATING PROCEDURES
This section of the manual provides all the instructions
necessary to start and operate the 2R-III, including spe-
cific instructions for loading, packing and unloading the
unit.
NOTE
It is important that operators and mechanics understand
these procedures.
PRE-OPERATING WALK-AROUND
INSPECTION
Each day, before starting the unit, perform the following
“walk-around” inspection.
1. Refer to the decal location illustration in SECTION 1,
SAFETY, of this manual and make sure all decals are in
place and readable. Replace any decals that are not.
NOTE
A decal kit, free of charge, is available from your local
authorized Leach distributor.
2. As you are checking for decals, also look for fluid
leaks on and around the unit. Check for fluid leaks at the
hydraulic cylinders, valves and fittings.
3. Inspect the attaching hardware. Make sure everything
is tight and that there are no broken or excessively worn
parts. Check capscrews and fasteners for looseness,
visible welds for cracks and control levers for each move-
ment.
SPRINGS
SECTION 3
3-6
REAR
MOUNT
HARDWARE
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...