![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517124.webp)
SECTION 9
9-29
SERVICE AND REPAIR
DESCRIPTION OF PUSHOUT PANEL
Refuse is compacted against and ejected from the body
by the Pushout Panel. The telescopic system uses one
multi-stage cylinder that is attached to the pushout panel
approximately half-way up the pushout panel.
During its movement through the body, the pushout
panel rides in a trough. The panel rides on replaceable
plastic wear blocks that control its movement in the
trough and reduce friction.
WEAR BLOCK REPLACEMENT
The wear blocks should be replaced before there is
metal to metal contact between the pushout panel and
trough floor.
OPERATIONAL STATUS
Truck Off
PTO Disengaged
Raise the side of the pushout panel (one side at a
time) enough to take the weight off the wear blocks.
Use a hydraulic jack or pry bar. Support the pushout
panel and remove the capscrews, nuts and
lockwashers securing the wear block retainers.
Slide the upper and lower wear blocks out and re-
place.
Reinstall the wear block retainers and tighten the
capscrews.
Lower the pushout panel.
Repeat this procedure for the ther side.
1.
2.
3.
4.
5.
PUSHOUT PANEL
WEAR BLOCKS
WEAR BLOCKS
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...