![background image](http://html.mh-extra.com/html/federal-signal-corporation/leach-2r-iii/leach-2r-iii_service-manual_548517067.webp)
SECTION 7
7-1
CHECK-OUT
GENERAL
The 2R-III has been designed to provide long periods
of trouble-free operation. Performing the check-out pro-
cedures below, at regular weekly intervals, will help to
prevent unscheduled downtime.
Make sure you know and observe all safety precau-
tions listed in Sec. 2 before performing any of the
following check-out procedures. Use extreme cau-
tion to avoid coming near any moving parts. Never
enter the body of the unit when the truck is run-
ning. Make sure the unit is in the correct operational
mode as indicated by the OPERATIONAL STATUS
block presented at the beginning of each check.
NOTE
Because of the location of various controls, some
checks will require two people.
OPERATIONAL STATUS
Truck Running PTO Engaged Speed Up On
OPERATIONAL STATUS
Truck Off
PTO Disengaged
CHECK HYDRAULIC TANK FLUID
LEVEL
Make sure the tailgate is down and clamped se-
curely.
Position the packer and carrier panels to the “IN-
TERRUPTED CYCLE” position.
Pull the pushout lever to position the pushout cylin-
der in the retract position.
The fluid level should be between the safe range
marks on the sight gauge.
1.
2.
3.
4.
IF NOT:
Add hydraulic fluid for normal operating and weather
conditions. See Sec. 6, PREVENTIVE MAINTE-
NANCE for additional information about servicing
the hydraulic tank.
5.
1 1/2"
Summary of Contents for LEACH 2R-III
Page 2: ......
Page 8: ......
Page 26: ...SECTION 2 2 8 ...
Page 28: ...OPERATION SECTION 3 LOCATION OF OPERATING CONTROLS 3 2 4 6 5 7 8 1 2 3 8 9 10 11 12 7 ...
Page 46: ...SECTION 3 3 20 ...
Page 54: ...SECTION 4 4 8 ...
Page 60: ...SECTION 6 6 4 PREVENTIVE MAINTENANCE 1 2 3 4 5 6 7 8 ...
Page 62: ...SECTION 6 6 6 ...
Page 76: ...SECTION 7 7 10 ...