
Preventive maintenance
4812164601_C.pdf
2023-01-05
Preventive maintenance
Complete maintenance is necessary for the machine
to function satisfactorily and at the lowest
possible cost.
The Maintenance section includes the periodic
maintenance that must be carried out on the machine.
The recommended maintenance intervals assume that
the machine is used in a normal environment and
working conditions.
Acceptance and delivery inspection
The machine is tested and adjusted before it leaves
the factory.
On arrival, before delivery to the customer, delivery
inspection must be conducted as per the check list in
the warranty document.
Any transport damage must be reported immediately
to the transport company, as this is not covered by the
product warranty.
Warranty
The warranty is only valid if the stipulated delivery
inspection and the separate service inspection have
been completed as per the warranty document, and
when the machine has been registered for starting
under the warranty.
The warranty is not valid if damage has been caused
by inadequate service, incorrect use of the machine,
the use of lubricants and hydraulic fluids other than
those specified in the manual, or if any other
adjustments have been made without
the requisite authorization.
103
Summary of Contents for DYNAPAC CC1400C
Page 2: ......
Page 16: ...r h 4812164601_C pdf 2023 01 05 ...
Page 20: ...Introduction 4812164601_C pdf 2023 01 05 4 ...
Page 30: ...Special instructions 4812164601_C pdf 2023 01 05 14 ...
Page 82: ...Machine description 4812164601_C pdf 2023 01 05 66 ...
Page 98: ...Operation 4812164601_C pdf 2023 01 05 82 ...
Page 118: ...Operating instructions Summary 4812164601_C pdf 2023 01 05 102 ...
Page 133: ...Maintenance Maintenance schedule 4812164601_C pdf 2023 01 05 Service Checklist 117 ...
Page 134: ...Maintenance Maintenance schedule 4812164601_C pdf 2023 01 05 118 ...
Page 146: ...Maintenance 10h 4812164601_C pdf 2023 01 05 130 ...
Page 164: ...Maintenance measures 250 h 4812164601_C pdf 2023 01 05 148 ...
Page 234: ...Maintenance 3000h 4812164601_C pdf 2023 01 05 218 ...
Page 239: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...