Version 6
Operating instructions
CCS Silver
Firmware 2021-01-14
Page:
7
of:
72
FAUDI Aviation GmbH, Scharnhorststraße 7 B, D-35260 Stadtallendorf
Manual_CCS_silver_Eng_
operation_version6.docx
2
Wiring and Assembly
The Circuit board on top of the CCS has inscriptions for the mounting of the signal cables.
To prevent damage, please make sure, not to connect power supply during wiring. Connect
power supply when all other connections are made.
Please use proper tools for making the connections. Use flexible copper wire to connect
signals to the CCS. We recommend flexible wire with a cross-section of 1 mm². It is not
recommended to mount wires without ferrules. An appropriate crimping tool must be used to
apply the ferrules to the wires.
The wiring diagram is shown in the photography:
DO1:
BLUE LED
Alarm
Relay
Water
Warning
Relay
program-
mable
(Ready)
program-
mable
AFG
Inlet
AFG
Outlet
DP
Flow
Rate
Power
Supply
RESET,
TRIGGER
I1: Interlock
I2: SLUGGUARD
I3: Override
Flow
Rate
DO1:
Blue Light