8. PUTTING INTO SERVICE
8.1 FINAL CHECKS
1. Make sure that the forces generated by the leaf
are within the limits permitted by the current
regulations. Use an impact force tester in accord-
ance with standards EN 12453 and EN 12445. For
non-EU countries, of there are no specific local
regulations, the force must be less than 150 N.
2. Check that the maximum force required to move
the leaf by hand is less than 220 N.
8.2 INSTALL THE BOARD ENCLOSURE
COVER AND DOOR
Before installing the board enclosure cover and door
you must have:
- completed the start-up procedure
- checked that the installed devices are working
properly
1. Install the enclosure cover
27
2. Install the door on the column
8.3 FINAL OPERATIONS
1. Highlight all areas with adequate warning signs
in which there are still residual risks, even if all
possible safety measures having been adopted.
2. Place a “DANGER, AUTOMATICALLY CONTROLLED”
sign in a prominent position on the door.
3. Attach the CE marking to the gate.
4. Fill out the EC declaration of conformity and the
system register.
5. Give the EC Declaration, the system register with
the maintenance plan and the instructions for use
of the automation to the system owner/operator.