176
FUEL SYSTEM
INTAKE MANIFOLD
Prime the threads with
Locquic Primer
and let dry.
Apply
Nut Lock
to threads. Position reed valve on
reed plate and install screws. Final torque is 25 to
35 in. lbs. (2.8 to 4.0 N·m).
Installation
Position reed plate assembly on cylinder/crank-
case.
Apply
Nut Lock
to screws. Install all screws.
Tighten the center screws first and expand out-
ward. Tighten in stages. Final torque is 60 to 120
in. lbs. (7 to 14 N·m).
Position gasket on throttle body. Install throttle
body on reed plate and install screws.
Tighten the center screws first and expand out-
ward. Final torque is 60 to 120 in. lbs. (7 to 14
N·m).
Install upper main bearing vent hose and secure
with tie strap.
Connect throttle linkage and electrical connectors.
Refer to
TPS Calibration
on p. 143.
002326
002328
002332
002329
Summary of Contents for E-tec 75 HP
Page 1: ......
Page 233: ...233 POWERHEAD POWERHEAD VIEWS 10 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 234: ...234 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 235: ...235 POWERHEAD POWERHEAD VIEWS 10 Front ...
Page 236: ...236 POWERHEAD POWERHEAD VIEWS Rear ...
Page 237: ...237 POWERHEAD POWERHEAD VIEWS 10 Top ...
Page 298: ...S 2 ...
Page 344: ......